Expired COI Alerts in Procore? Stop the Daily Chase | Billy

Procore · COI Tracking

The Daily Expired-COI List: Why Procore Contractors Get a Headache Every Morning (and How to Stop It)

By , Founder & CEO, Billy · Updated · 8 min read

Short answer

Procore emails your insurance manager every day once a vendor’s policy is within 14 days of expiring, and keeps emailing for up to 60 days after. The alert tells you who is expired. It doesn’t request the new certificate, read the endorsements, or follow up with the sub. That work still falls on your team. Automating COI tracking means connecting Procore to a tool that requests, reviews and chases certificates for you, then writes compliance status back into Procore.

The morning list: one accounting team’s story

This week we met with the accounting team at a construction management firm in South Florida. Three people, all on the accounting side, none of them hired to be insurance specialists. They run their projects in Procore.

Every morning starts the same way. Procore’s email lands with a list of certificates of insurance that have expired. Someone opens Procore, finds each vendor, digs into the insurance tab, then picks up the phone. If the sub doesn’t answer, they send an email. Then they do it again for the next one. And again tomorrow.

One of the team, a few months into the job, described COIs simply as the thing that gives them a headache. Not the hard work of construction accounting. Not the pay apps. The certificates.

Their numbers explain why:

~3 dozenactive projects
15–25subcontractors per project
500–750project-specific COIs a year
0people who own COIs full-time

Every sub needs general liability, workers’ comp and auto, with a waiver of subrogation on GL and WC. Each certificate is project-specific, not blanket. Project managers request the first COI when they write the subcontract, then accounting inherits every renewal for the life of the job, and after it.

If this sounds like your office, you’re not alone. It’s the most common story we hear from Procore contractors.

Why does Procore send a daily list of expired COIs?

Procore’s Directory tool tracks a vendor’s insurance by expiration date. When a policy is two weeks from expiring, Procore starts emailing your designated insurance manager daily, and it keeps sending for up to 60 days after the expiration date or until someone updates the record. Procore can also notify the vendor’s primary and invoice contacts.

That’s a useful safety net. But the alert is a report, not a process. It tells you a policy lapsed. It doesn’t:

  • send the sub (or their broker) a request with your specific requirements,
  • give them a place to upload the new certificate and endorsements,
  • read the new documents to check named insured, additional insureds, limits and waivers,
  • follow up when the sub ignores you, or
  • update the record once a compliant certificate arrives.

So every name on the list turns into a small manual project. Multiply that by 15 to 25 subs on three dozen jobs and the list never really gets shorter.

What does the manual COI chase really cost?

Here’s the loop for one expired certificate:

  1. Open the expiring-insurance email.
  2. Find the vendor and project in Procore.
  3. Look up the right contact (the sub, their office, or their broker).
  4. Call. Leave a voicemail. Send an email with your requirements.
  5. Wait. Follow up. Follow up again.
  6. Receive a certificate, often missing something, and review it box by box.
  7. Reject it, explain why, and start the wait again.
  8. Update Procore when it’s finally right.

Contractors we work with have measured the review step alone at about 11 minutes per insurance document. At 500 to 750 COIs a year, that’s roughly 90 to 140 hours of review, before counting a single phone call. For a three-person team that also runs AP, that time comes straight out of month-end close.

The bigger risk: what manual review misses

The time is painful. The misses are expensive. When a team reviews certificates under pressure, the common errors are predictable:

  • Wrong or misspelled named insured, so the certificate doesn’t match the subcontract.
  • Missing additional insureds: your company, the owner, the lender.
  • No waiver of subrogation on GL or workers’ comp when the contract requires it.
  • Incorrect certificate holder address.
  • Exclusions you can’t see on an ACORD 25, such as an action-over exclusion or a prior-work exclusion, that can make the policy far less useful than the certificate suggests.

Remember: an ACORD 25 is evidence that a policy exists. It isn’t the policy. The coverage that protects you lives in the endorsements, so a review that stops at the certificate checkboxes leaves the most important part unread.

As the accounting team put it to us, manual review has a ceiling: people can’t catch everything every time. Automation applies the same checks to every document.

How to automate COI tracking in Procore (7 steps)

This is the setup we walked that team through. It took about six minutes in the demo, and most contractors are fully live within two weeks.

  1. Connect Procore once. Authorize the integration and pick your company. Projects you import stay in sync, so every new subcontract or purchase order written in Procore flows in automatically.
    Step 1. Pick the projects once. Every subcontract written in Procore after that flows into Billy on its own. (Illustration; sample data.)
  2. Write your requirements one time. Set coverages (GL, WC, auto, umbrella), limits, waivers of subrogation, primary and non-contributory wording, and additional insureds. Apply them by project or by trade, and attach your sample COI so every sub and broker sees exactly what you expect.
    Step 2. Requirements mirror your contract exhibit: every checkbox, limit, endorsement and additional insured, plus your sample COI. (Illustration; sample data.)
  3. Send requests from your own email address. Subs see your company name, not a stranger’s. They upload through a secure link with no login, and can forward it to their broker.
    Step 3. The sub gets a request from your address and uploads through a link, like signing a DocuSign. Items in red are the ones you flagged as must-haves. (Illustration; sample data.)
  4. Let AI review the certificate and endorsements. Every document is checked against your requirements, and each deficiency gets a plain-language reason, such as “additional insured missing for owner and lender.”
  5. Keep a human in the loop. Your team approves or overrides each finding in a click. Notes you leave (for example, an approved exception for one vendor) are applied to future reviews.
    Steps 4–5. Billy reads the COI and endorsements, writes the reason for each finding, and your team agrees or overrides in one click. The reason goes straight back to the sub. (Illustration; sample data.)
  6. Automate the follow-up. Subs who don’t respond within 48 hours are re-requested automatically, every 48 hours, until they comply. No more calls.
    Step 6. Instead of a daily list to work through, the dashboard shows what Billy is already chasing and what needs a decision. (Illustration; sample data.)
  7. Write status back to Procore. Compliance updates the company and project insurance records in Procore, so PMs see who is cleared before anyone steps on site or gets paid, and scheduled reports go to accounting and PMs.
    Step 7. Your PMs keep working in Procore. Billy writes the review result into the company and project insurance tabs, so nobody enters it twice. (Illustration; sample data.)

The result: the morning list stops being a to-do list. The system works it for you, and your team only looks at what needs a decision.

Do you still need COIs after the project is finished?

Often, yes. Many GCs keep requiring current certificates after completion, especially while retainage is held, so completed-operations coverage is in place if a defect claim shows up later. Subs tend to push back (“the job ended months ago”), which makes these renewals the hardest to collect by phone.

In Florida, the window to worry about got shorter but didn’t go away. In 2023, the legislature cut the construction statute of repose from ten years to seven and changed it to run from the earliest of its trigger dates. Your contracts and counsel decide how long you track coverage. The tool should simply enforce it.

In Billy, that’s warranty mode: enter the substantial completion date and how long to keep tracking. Billy keeps requesting renewals from the subs that matter, skips the ones you deactivate (the cleaning crew, for example), and freezes the project automatically when the period ends, with an email to your admins a week before.

Warranty mode. Set the completion date and how long to keep coverage current; Billy keeps requesting renewals from the trades that matter and stops on its own. (Illustration; sample data. The period shown follows Florida’s seven-year repose; set yours with counsel.)

Manual tracking vs. Procore alerts vs. automated COI tracking

TaskSpreadsheet & emailProcore alerts onlyProcore + Billy
Know who is expiredManualDaily emailLive dashboard + reports
Request the new COICall / emailCall / emailAutomatic, from your address
Sub / broker upload portalNoNoYes, no login
Read endorsements & exclusionsBy handNoAI review, human approval
Follow up with non-responsive subsBy handNoEvery 48 hours
Update Procore insurance recordsDouble entryDouble entryAutomatic sync
Track COIs after completionCalendar remindersManualWarranty mode
Audit-ready historyScatteredPartialFull audit trail + PDF reports

What to check on every COI (Florida GC checklist)

  • Named insured matches the subcontract exactly
  • GL, workers’ comp and auto limits meet the contract
  • Additional insureds: GC, owner, lender (and any others in the contract)
  • Waiver of subrogation on GL and WC
  • Primary and non-contributory wording, where required
  • Certificate holder name and address are correct
  • Policy dates cover the work period, plus any post-completion requirement
  • No action-over, prior-work or residential exclusions that conflict with the job
  • Workers’ comp exemption certificates verified where a sub claims one

Frequently asked questions

Why does Procore keep emailing me about expired insurance?

Procore emails the designated insurance manager daily starting two weeks before a vendor’s policy expires, and continues for up to 60 days after the expiration date or until the record is updated with a new expiration date. The emails stop when the insurance record in the Directory is updated.

Can Procore collect and review COIs on its own?

Procore stores insurance records and flags expirations, but it has no vendor upload portal for COIs and doesn’t read endorsements. Teams typically add a compliance tool like Billy that requests, reviews and chases certificates, then syncs status back into Procore’s insurance tabs.

How do you automate COI renewals for subcontractors?

Connect your project management system, set insurance requirements once, and let software send requests from your company’s email, collect uploads through a no-login link, review documents against your requirements, and re-request automatically (for example, every 48 hours) until each sub is compliant.

Do subcontractors need an account to upload their COI?

Not with Billy. Subs and their brokers get an email and a secure link, similar to signing with DocuSign, and upload without creating a login.

How long should a Florida GC keep collecting COIs after a project ends?

It depends on your contracts and your counsel’s advice. Florida’s statute of repose for construction claims has been seven years since 2023, and many GCs also require current coverage while retainage is held. Billy’s warranty mode lets you set any post-completion tracking period.

How is Billy priced?

Billy is priced per vendor contract, meaning each subcontractor you request a COI from on a project. Users, the Procore integration and tracking for other documents such as W9s and business licenses are included.

Make the morning list someone else’s job

See Billy work against your own requirements and your own Procore projects in a 30-minute demo.

Book a demo